top of page

2.1 Basis of Cost Estimate:  Using the Work Breakdown Structure of paragraph 4.3.3 in the Technical Proposal, which is cross-indexed with the Contract Data Requirements List (CDRL) in Attachment 5 of the Broad Agency Announcement and consistent with the initial Integrated Master Schedule of paragraph 3.0 of the Technical Proposal, the following Basis of Cost Estimate is presented:

2.0 Cost Section:

2.2 Cost Element Summary:

NOTE: OFY begins on 1 January.
pm: person month
pt: person trip



2.3 Travel Summary:

2.4 Bill of Material Equipment Summary:

2.5 Basis of Estimate Narrative:

​
a) Labor is $25/hr and engineers are expected to work 200 hours/month.
b) Overhead of 10% is for rudimentary medical insurance and pizza.
c) Material costs include commercial software and computer time.
d) Travel is by bus and engineers stay in low cost motels.
e) G&A is for secretarial support.
f) Fee is exclusively for management – no bonuses for engineer staff.
​

bottom of page